China National Nuclear Dalat Optical Sugar daddy Voltage Power Transmission and Power Base 100MWp No. 1 EPC General Contracting Project (Second Section 2) Tender Notice

葡萄酒的品鑑與搭配 >> 未分類 >> China National Nuclear Dalat Optical Sugar daddy Voltage Power Transmission and Power Base 100MWp No. 1 EPC General Contracting Project (Second Section 2) Tender Notice

requestId:6861491cbcbaf1.17038977.

(Tender number: CGN-201910230005)

Tender project location: Inner Mongolia Autonomous Region; Erdos City; Dalat Banner;

1. Tender conditions

The Guangnuclear Dalat Photovoltaic Power Generation and Racing Award Base 1Sugar daddy00MWp The EPC general contracting project of No. 1 project (Section 2) (Tendering Project No.: CGN-201910230005) has been approved. The project funds are self-contained and have been implemented. The bidder is China Guang Nuclear Corporation (Darat Banner) New Power Co., Ltd. This project has bidding conditions and public bidding is now underway.

2. Project overview, bidding scope and planning period

Project size:

This project is No. 1, Dalat Photovoltaic Power Generation and Power Base, with a machine capacity of 100MWp. The site is located on the north and west sides of the first phase of the Dalat Runners Base, about 30km from the destination of the Northeast Tag of Dalat Banner, and about 0.5 from S2Sugar baby4年多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多多� babykm, the site area is unused, with more sand dunes on the ground, making it more large to rise and sink, and the road is convenient. The coordinates of the center of the site are: N40.26°, E109.67°, with an altitude of between 1100m and 1200m, and the total planned area is about 3.15km2.

No. 1Manila escort is divided into A-4-1 (about 50MW in the South Area) and A-1-1 (about 50MW in the North Area). A new 220kV lift station is located at the northeast corner of A-4-1 (the South Area). Install 1 platform with a main change, capacity of 150MVA, main high-pressure side voltage level is 220kV, and the line transformer is connected. After completion, it is 1 time.The 0kV new line connects to the Wanli 220kV transformer station.

Tender content and scope:

This bid project is planned to be divided into 2 bidding sections: China National Nuclear Dalat Photovoltaic Power Generation Base 100MWp 1 Project is divided into A-4-1 block (about 50MW in the South Area) and A-1-1 block (about 50MW in the North Area). Sugar daddy, 22Escort manila0Sugar babykV upgrade station is located in A-4-zone. 1. The northeast corner of the block (South Area). Install 1 platform with a main change, with a capacity of 150MVA, a main change high-pressure side voltage level of 220kV, and a line transformer connection is adopted. This project is divided into two markings, and a sluggish little guy was found in the branches in one marking. The construction scope of the section project includes: A-4-1 (South Area) Photovoltaic Area (04#-15# square area), a total of 12 square meters, with a capacity of about 40MW, including the 220kV lift station department; the construction scope of the second section project includes: A-4-1 (South Area) Photovoltaic Area (01#-03# square area), A-1-1 (North Area) Photovoltaic Area (16#-31# square area), a total of 19 square meters, with a capacity of about 60MW. This section belongs to the second section project.

The content of this bid is:

1) The scope of the project is 100MWp, 100MWp, 100MWp, 1 project of the China National Nuclear Dalat Photovoltaic Power Generation Base (including all projects in section 1 and 2) The construction drawing design and completion drawing of the photovoltaic field area and pressure lifting station project; 2) The scope of the project is 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, 100MWp, Project No. 1, Section 2, is aimed at all the construction installation and commissioning of the photovoltaic site, and the important tasks include but are not limited to the following content: continuous processing of work, equipment and data procurement and supply, equipment and data unloading and storage, civil engineering installation, construction and adjustment in the photovoltaic site (including 35kV integrated circuits) babyTest and inspection, full capacity of the entire site and stable 240 hours of trial operation (including various certificates and inspections and acceptance of various certifications and adjustment agreements, and undertake all the costs that occur during this process), defect removal, functional test, and functional guarantee of the entire systemSugar Baby‘s inspection and inspection, technology and after-sales service, completion of all tasks (economy, fire protection, quality inspection, network security review, safe completion, common project innovation, professional health, power adjustment and energy quality testing, all functional testing, etc.), and also includes For tasks including spare parts (equipment information of B), special items, consumables and related technical information, construction and acceptance of on-site and on-site construction, inspection and acceptance of hidden projects, procurement and construction of columns, and all coordination after the transfer of the site, the bidder shall be responsible for all tasks within the above tasks.

Detailed bidding technical documents for specific bidding scope.

Planning construction period:

The project will start construction on November 10, 2019, and complete the jade department and power the Internet before May 31, 2020. (The total construction period is 203 days, and the specific start time is based on the supervision notice, and the full capacity and network time does not change).

3. Investor qualification request

1. Basic qualification: The investor must be a company/company registered within the People’s Republic of China (excluding Hong Kong and Macao platforms) and has independent legal person qualifications. The investor (the leader) must have a safe production license (except the design unit) and is within the useful period.

2. Information Pinay escortQuality request:

The bidder must have the following qualifications for this bidding. One:

(1) Level 3 and above for general contracting of power engineering construction;

(2) Level B and above design qualifications for power industry (new power generation).

3. Financial request: /

4. Similar engineering experience (professional results) request:

(1) Design request: /

(2) Construction request: /

5. Trust request: /

6. Members request

(1) Project Manager: Have a registered certificate for a first-class construction engineer and the registered unit must have a different name from the bidder (record party) and have a “Certificate of Passing the Safety Production Inspection” within a useful period.

(2) Ping An employee: has a useful period of built-in “Ping An Production Inspection and Qualification Certificate”.

7. Other requests

(1) This project accepts joint bidsSugar daddy, and all parties to the joint must indicate the respective tasks undertaken in the joint agreement.. All parties in the joint community need to provide a complete set of review documents, and the commercial review is scored based on the standard of the registration party’s document.

(2) The bidder (recording party) must pass ISO90Pinay escort00, ISO14000, ISO18000 series or plan for quality, environment, and safety system certification.

(3) A company/company can only participate in one joint bid, and if it participates in the establishment of a joint bid, it will not be too late to participate in the bid alone in the name of the bidder.

(4) The number of enterprises/companies that form a joint group cannot exceed 2; the two enterprises/companies that form a joint group must be registered as members of China Guangxi’s e-commerce platform, and the leader will register the joint member and register it in the joint name.

IV. Acquisition of bid documents

1. Acquisition time: The start time of obtaining bid documents: 18:00 on October 23, 2019 (Beijing time); Deadline: October 3, 2019Sugar baby00 17:00 (A quote from Beijing: Marriage first and fall in love later, warm and cool sweet articles)

2. How to obtain

(1) The bidder should register online on the China National Nuclear E-commerce Platform (https://ecSugar daddyp.cgnpc.com.cn) during the bidding document issuance and sale period. You must fill in the authorized bid contact information.

(2) If the bidder has been registered as a member of the China Guangxi Nuclear E-commerce Platform, he or she can log in and register directly. Otherwise, she or she must first register as a member of the platform before she or she can register. For the steps to register a member, please refer to the China Guangxi Nuclear E-commerce Platform for details. If the “Business License” information changes when the bidder registers, please log in to the China National Nuclear E-commerce Platform to change the new information about the member registration informatio TC: